Utilities & Drainage Construction

 

Hillside Water Storage Tank

The City will replace the 500,000 gallon elevated steel storage tank at Hillside Park with a 2 million composite (concrete stem with a steel tank) in 2008. This will be of a similar design as the recently completed tank on Prestige Circle. The tank will be the same height as the existing 500,000 gallon tank at Hillside Park. Design is complete. Construction has begun and is anticipated to be substantially completed June 2011.

The bowl was raised on October 15, 2010.  Click here to watch time lapsed video.

 

North Texas Municipal Water District 60-inch Sanitary Sewer Rehab, Ph 2

Project by NTMWD
Re-lining of the existing 60-inch sanitary sewer line in Country Brook.  Anticipated construction to be complete June 2011.

 

US 75 Waterline

Currently in design.  Construction anticipated to begin Spring 2011.

 

Walden Park Water & Sanitary Sewer Replacement

Construction anticipated to begin April 2011.

Click Here for Frequently Asked Questions and Anticipated Schedule